May 2012 to Now
Responsible for more than 30 slurry pipeline projects from feasibility study, basic engineering and detail engineering to technical consulting services, including
* Zhongrong Xinda Peru Pongo Iron Concentrate Pipeline and Water Pipelines, responsible for feasibility study, 2017
* Australia Magnetite Mines Iron Concentrate Pipeline and Water Pipelines, responsible for feasibility study, 2017
* Xingjiang Dengde Mining (Xinjiang Bayi Steel and Iron Group), Iron Ore Pipeline, responsible for feasibility study, 2017
* Gosowong Gold Mine tailings pipeline (Indonesia), MIEAust, Tailings and Return Water Pipelines, responsible for feasibility study, 2017
* CP Mining iron concentrate pipeline (West Australia) : responsible for system update and operation optimization, 2017.
* Xinjiang Hetiao Guanghui Zinc ore slurry pipeline (Xinjiang, China):responsible for wear loop test, 2016./p>
* Chinalco Pulang copper tailings and return water pipelines: 30km long, DN530 (Yunnan, China): EPC project, responsible for feasibility study, basic and detail engineering, 2016.
* Gosowong Gold Mine tailings pipeline (Indonesia), MIEAust, Hydraulic calculation review, 2016.
* Phu Kham Mining tailings pipeline (Laos), PanAust, responsible for system review and hydraulic calculations for system updates, 2015.
* Phu Bia Mining tailings pipeline (Laos), PanAust, responsible for operation problem finding, solution and system optimization, 2014.
* Peru Shouxin Tailings Pipeline (Peru), Minera Shouxin, responsible for feasibility study, basic and detail engineering, 2014.
* Tongling Shaxi copper pipeline (Anhui, China), Tongling Group, responsible for feasibility study, basic and detail engineering, 2014.
* Test pipe loop study on coarse particle slurry: friction loss, wear rate and re-start with slurry for different pipe materials, 2014.
* Yuantong Guangfu tailings pipeline (Chengde, China), Yuantong Group, responsible for feasibility study and basic engineering.
* Zijin Jinbao iron concentrate pipeline, 110km, DN300 (Xinjiang, China), Zijin Group, responsible for feasibility study, 2014.
* Paergang iron concentrate pipeline, 150km, DN200 (Xinjiang, China), Bayi Iron and Steel Group, responsible for feasibility study, 2013.
* Hebang Phosphorus concentrate pipeline, 62km, DN250 (Sichuan, China), Hebang Group, responsible for feasibility study and basic engineering, 2013.
* Paergang water supply pipeline, 175km, DN450 (Xinjiang, China), Bayi Iron and Steel Group, responsible for design optimization, 2012.
* Congo NaCI pipeline,20km, DN350 (Congo), responsible for feasibility study and basic engineering, 2012.
* Shanmei coal slurry pipeline, 726km, DN450 (Shanxi, China), Shanmei Group, responsible for design review, 2012.
April, 2012
Logum Alcohol Pipelines, Brazil: Transient analysis
Responsible for transient analysis in the basic engineering for the alcohol transport pipeline, pipeline length = 734 km and diameter from 14” to 24”.
Feb. to Mar., 2012
MMX Iron Concentrate and Reclaim Water Pipelines, Tailings and Reclaim Water Pipelines, Brazil: Transient analysis and design review
Responsible for transient analysis and pipeline system design review in the feasibility study for the four pipelines, length from 8 km to 41 km, and iron concentrate throughput = 3206 tph.
Nov., 2012
Anglo America Expansion – Iron Concentrate Pipeline, Brazil: Transient analysis
Responsible for transient analysis in the feasibility study for three design options of the 527 km pipeline: 2 PSs and 30 MTA; 2 PSs and 60 MTA; and 3 PSs and 60 MTA.
Aug., 2012
Antamina Pipeline Leak Site Investigation, Peru: Hydraulic and pipeline system specialist
Responsible for site investigation on the slurry leak from a bend spool occurring on July 25, 2012 at VS1 and system operation safety study.
April – Oct., 2012
Phu Bia Mining tailings pipeline, Laos: Commissioning and operation support
Responsible for commissioning plan, schedule, procedures, choke station updates and operation support for the gold silver tailings pipeline: 16” in diameter, 9.92 km long, and pipeline design capacity 500 tph
2010-2012
Las Bambas Copper Concentrate Pipeline, Peru: Project lead in both hydraulic and mechanical disciplines.
Responsible for hydraulic design and optimization, P&ID, mechanical design, hydraulic transient analysis, and pipeline simulator development for a 216 km, 8.625-inch, 140,000 dmtpd pipeline system.
2010-2012
Pan Zhi Hua Iron Concentrate Pipeline, China: Process engineer, hydraulic specialist, and commissioning lead.
Responsible for hydraulic design and optimization, transient analysis, pipeline simulator development and commissioning for a 95 km, 10.75-inch, 400 tph pipeline system.
Sept. – Dec., 2011
Los Bronces Slurry Pipeline, Chile: Commissioning team lead as both hydraulic and mechanical specialist.
Responsible for commissioning plan, schedule, procedures, and executions for a 5 choke station slurry pipeline system: 28” in diameter, 51.7 km long, and pipeline design capacity 3500 tph.
Aug. – Nov., 2011
Los Bronces Reclaim Water Pipeline, Chile: Commissioning team lead as both hydraulic and mechanical specialist.
Responsible for commissioning plan, schedule, procedures, and executions for a 5 pump station water pipeline system: 2 pipelines (20” and 24”), 56.6 km long, design flow 2450 m3/h.
2010-2011
Samarco Third Iron Concentrate Pipeline, Brazil: Process engineer and hydraulic specialist.
Responsible for hydraulic design and optimization, transient analysis, and pipeline simulator development for a 400 km, 22/20-inch, 400 tph pipeline system.